At SECOMI we carried out a longitudinal ducting in a street in Figueres, working alongside the sidewalk and within an environment that was to continue functioning while the work progressed. Opening the ditch was only part of the work: it was also necessary to protect the pedestrian passage, maintain traffic flow, and resolve each section without blocking access points or existing urban elements.
We organize the excavation, the removal of material, and the progress of the ducting by zones, maintaining the work site marked and controlled. In this type of work, what remains underground is important, but so is how everything that happens on the surface is managed while it is being carried out.
Main data of the work:
- Performance: construction of urban ducting.
- Environment: street in use in Figueres.
- Development: longitudinal intervention next to the sidewalk.
- Visible works: opening of the ditch, removal of material and preparation of the route.
- Visible media: mini excavator, work vehicle and container.
- Security: fencing, cones and continuous demarcation of the work area.
- Conditioners: traffic flow, urban transport, pedestrians and access routes.
The project,
step by step
Frequently asked questions about this project
Can a ditch be opened in an already-in-use street?
Yes, and opening the ditch is just part of the work. In Figueres, we implemented a longitudinal canal alongside the sidewalk, in an environment that was supposed to continue functioning as the work progressed.
What was done in the Figueres ducting?
A longitudinal ducting in a street of the city, with the ditch, the protection of the area and the subsequent restoration.
Does SECOMI do urban civil works?
Yes: sewer pipes, sanitation, sewers and solid material replacement, with the street in service. We explain this on the «Structures and civil works» page.
Can we help you evaluate your project?
Projects
like this one
Medinyà · Gironès
Redevelopment of Dr. Fleming Street, Medinyà
The Far d’Empordà · Alt Empordà







