Opens in a new tab

Refurbishment and waterproofing

Once water has got in, patching over it won’t fix it.

Facades, roofs and whole buildings. We repair what is damaged, waterproof what needs it and leave the building ready to withstand whatever comes, not just until the next rain.

Why do residents’ associations call us?

Works in inhabited buildings

We work with people living inside: access, noise and dust organized every day.

Custom-made façades

Mouldings, cornices and balconies restored when the building has them. That is where you can see real craftsmanship.

Up-to-date prevention documentation

Safety plan, training and certificates in order, also for working in communities and public buildings.

REFURBISHMENT AND WATERPROOFING SERVICES

Behind the same facade there isn’t always the same problem

That is why, before starting work, we assess properly what is failing and which solution best fits each case.

Repair of cracks and fissures in the facade during refurbishment work

Projects that require renovation or waterproofing

  • When the deterioration is already noticeable in cracks, moisture, fissures, or areas that are starting to peel off.

  • When the facade stops responding well and continues to delay the renovation, it only makes the problem worse.

  • When a facade repair can no longer be resolved in any way and you need well-focused intervention from the outset.

«At this point it is advisable to pause, carefully assess what is happening and define what intervention your facade really needs.»

That's where at SECOMI we help you find the most appropriate answer.

Facade of building in Girona pending renovation due to external deterioration

Facade refurbishment

Repairing what is damaged, repairing on a good basis and protecting again. With mouldings, cornices and balconies when the building has them: that is where the craft is seen.

Refurbishment of buildings

Pathologies, reinforcement and consolidation, accessibility and improvement of isolation, in buildings where people continue to live while working.

Roof waterproofing

Building and industrial buildings covers: sanitation, waterproofing system and joint reinforcement, connections and drains, where the real water enters.

Communities and farm managers

We work with homeowners’ associations and property managers, keeping the documentation of the work and prevention measures up to date.

Refurbishment and waterproofing in Girona and the province

See Works

Refurbishment and waterproofing in Girona and the province

Projects that speak for themselves
See Works
SECOMI worker refurbishing the facade of a building in Cala Rovellada, Colera

Restored facades, patios and steps by the sea, which is the worst enemy of a facade.

Residential complex in Colera

Refurbishment work on the sloping roof of a house in Santa Coloma de Farners

Metal reinforcement, insulation and new cladding in a space with complex geometry.

Roof and attic in Santa Coloma de Farners

Ornamental facade refurbished by SECOMI in the Horts Passatge in Portbou

Mouldings, cornices and motifs recovered from a narrow access street, where large machinery does not enter.

Ornamental facade in Portbou

Area of the square of the Monastery of Santa Maria with the pavement removed and the ground prepared

External landscaping to restore the environment and reduce the urban heat island effect.

Monastery of Santa Maria, in Cervià de Ter

Detail of balcony and mouldings after the facade renovation in Portbou

Mouldings, cornices and balconies restored when the building has them. That is where you can see real craftsmanship.

Facade in Portbou

New construction with wooden beams mounted on the original stone walls of the house

Work in progress: total conversion of a building in the old town between party walls to create a single-family home, while retaining the original stone walls and vaults.

Conversion to a single-family home in Mieres (work in progress)

HOW A FACADE REFURBISHMENT COMPANY WORKS

Starting well is almost as important as executing well

«Therefore, before intervening, it is necessary to understand what is failing, decide how to act and properly order what will be repaired and how, so that the work progresses with greater control and fewer unforeseen problems.»

STEP 1

Review of the state of the facade

Before proposing the work, we reviewed where the cracks, fissures, moisture, detachments, or loss of protection are located to fully understand what is failing and to what extent action should be taken.

STEP 2

Proposal for refurbishment

With that basis, we make it clear what will be refurbished, repaired, waterproofed or improved, and how the work should be organized so that the project can get underway with a well-defined roadmap.

STEP 3

Coordinated execution of work

We enter the project with a well-planned work plan, coordinating each intervention so that the refurbishment progresses in a meaningful way and without having to fix what should already be resolved along the way.

STEP 4

Follow-up, review and closure

During the work, we reviewed how each part is performing and completed the work with control to ensure that the facade does not leave any unfinished work or solutions left half-finished.

We come, we look at it and we tell you what we see

We look at what is failing and how far it is appropriate to act, so as not to fall short or do more than is necessary.

Frequently asked questions about refurbishment and waterproofing

When the deterioration affects several areas, when there is moisture or debris, or when the problem returns every year. Then the timely repair becomes more expensive: you pay twice.

Yes. Secomi works with communities and with property managers, and is accustomed to construction projects in buildings where people live while work is being carried out.

It depends on the system and, above all, on how the support underneath is. That's why Secomi repairs the support before waterproofing: on a poorly maintained base, any system lasts less time than the manufacturer says.

Yes, and it is one of the most common jobs in the industry: leaks, seals, roof cover joints and drains, with the in-house activity functioning.

Yes. Before proposing anything, Secomi looks at what the problem is and how far it is necessary to go, so as not to be short on resources or do more than necessary.

Yes, and that’s usually the best time. If the facade already needs to be touched up, incorporating insulation costs much less than doing it separately.

SECOMI
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.