At SECOMI we repaired the Ginestar bridge, an existing infrastructure over the Llémena stream that needed to restore the safety and functionality of the crossing. The work required working both from the roadway and under the board, within a narrow environment, with slopes, vegetation and the riverbed itself conditioning access.
We prepared the work area, installed the auxiliary equipment, and worked on piles, supports, and the lower part of the bridge. We repaired damaged areas, recovered the affected volumes, and re-protected the surfaces to restore continuity to the whole while keeping the conditions of the surrounding environment in mind.
Main data of the work:
- Promoter: City Hall of Sant Gregori.
- Use: Public road infrastructure.
- Location: Ginestar bridge, Santa Afra road.
- Course: Riera de Llémena.
- Performance: Repair and improvement of the bridge.
- Visible works: access preparation, scaffolding, repair of batteries, supports and underlays of the dashboard.
- Conditioners: Work under the bridge, proximity to the riverbed and limited access.
The work,
Step by step
Frequently asked questions about this work
How is a bridge repaired?
Working from both sides. At the Ginestar bridge, over the Llémena stream, it was necessary to act both from the roadway and below the board.
What was repaired on the Ginestar bridge?
An existing infrastructure that needed to restore the safety and functionality of the crossing, for the City of Sant Gregori.
Does SECOMI work on road infrastructure?
Yes: bridges, footbridges, walls and civil engineering for administrations. We explain this on the «Structures and civil engineering» page.
Can we help you evaluate your work?
Projects
related
Medinyà · Gironès
Redevelopment of Dr. Fleming Street, Medinyà
The Far d’Empordà · Alt Empordà









