At SECOMI we execute the concrete walls that delimit and organize one of the exterior areas of the Calsina Carré facilities. Before erecting them, we work on the ground, the trenches and the drainage, because in a compound with truck traffic any unevenness or accumulation of water can condition the subsequent operation of the space.
We developed the armor, formwork, and concrete work in stages, adapting to the layout and the different intersections of the perimeter. Upon completion, we installed the metal enclosure, leaving a continuous and robust solution that protects the enclosure and fits into the daily operations of the logistics area.
Key data about the work
- Customer: Calsina Carré.
- Main performance: Construction of reinforced concrete walls.
- Environment: Logistic facilities with heavy-duty vehicle traffic.
- Previous work: excavations, trenches and base preparation.
- Visible drainage: buried driveways and auxiliary concrete structures.
- Execution: Armored, reinforced and concreted in sections.
- Top closure: Perimeter metal enclosure.
The project,
step by step
Frequently asked questions about this project
What needs to be resolved before erecting a concrete wall?
The terrain, the trenches and the drainage. At Calsina Carré facilities were first worked on, because in a site with truck traffic any unevenness or accumulation of water conditions the subsequent operation of the space.
What was built in Pont de Molins?
The reinforced concrete walls that delimit and organize one of the exterior areas of the Calsina Carré facilities, with the previous excavations and drainage.
Does SECOMI build retaining walls and reinforced concrete?
Yes, with our own formwork and steelwork equipment. We explain this on the «Structures and civil works» page.
Can we help you evaluate your project?
Projects
like this one
Vilablareix · Gironès
Two industrial buildings for GP Recambios, Vilablareix
Cornellà del Terri · Pla de l’Estany













